Illustrated title card for the guide: How to Size a UPS for a NAS and Homelab (VA, Watts, Runtime)

How to Size a UPS for a NAS and Homelab (VA, Watts, Runtime)

Add up your NAS and homelab load in watts and VA, then use a manufacturer’s runtime chart to find a UPS that gives your gear time to shut down.

By Homelab UPS Editorial Published Read 3 min

Size a UPS for your NAS and homelab by adding up the watts and VA of everything that needs battery power. Choose a UPS that covers both totals, then look up how long that exact model can run at your load in watts. Allow enough time for the equipment to finish shutting down. CyberPower CP1000PFCLCDa specifications · Example Eaton runtime chart · Network UPS Tools configuration notes

List the equipment that needs battery power

Start with the NAS and any hosts you need to keep running or shut down cleanly. For network-controlled shutdown, include the network gear your shutdown plan depends on. Network UPS Tools configuration notes

Add up watts and VA separately

Record each device’s input watts and VA. P3 P4400 specifications

This example uses hypothetical loads.

Battery-backed deviceWattsVA
NAS80 W100 VA
Homelab host190 W240 VA
Network switch30 W40 VA
Total300 W380 VA

Screen each candidate against the two columns independently. In this example, it must support at least 300 W and 380 VA. Add any equipment you already plan to put on the battery outlets before doing this calculation. CyberPower CP1000PFCLCDa specifications

Set the runtime you need

For a clean shutdown, budget for any delay before shutdown starts and the time for all protected systems to finish. For example, a planned wait of 2 minutes, 3 minutes to shut everything down, and a 3-minute reserve give an 8-minute runtime target. Network UPS Tools configuration notes

Use the total watts you expect during that window. To estimate runtime for a specific workload, you can take readings under that workload with a plug-in meter that displays watts, such as the P3 P4400, and add the readings for the devices on battery. P3 P4400 specifications

Read the runtime at your load

Open the manufacturer’s runtime chart for the exact model. Find your load on the watts axis and read the corresponding time in minutes. On Eaton’s example chart, hover over the graph to see detailed values. Compare the resulting time with your runtime target. Example Eaton runtime chart

Suppose the example setup draws 300 W during the outage. CyberPower rates its CP1000PFCLCDa at 1,000 VA and 600 W, with 6 minutes of runtime at half load. It passes the capacity screen. CyberPower CP1000PFCLCDa specifications

Check battery outlets and shutdown support

Check that every device on your list has a battery-backed outlet. For example, the CP1000PFCLCDa lists 10 outlets, of which 5 provide battery backup. CyberPower CP1000PFCLCDa specifications

For a NAS or server that uses Network UPS Tools (NUT), look up the exact UPS model and connection type in its compatibility list, then use the configuration guide for automatic shutdown. NUT hardware compatibility list · Network UPS Tools configuration notes

Evidence and limits. Eaton’s example runtime chart, the P3 P4400 and CyberPower CP1000PFCLCDa specifications, and the NUT 2.8.5 documentation were checked on November 26, 2026. The procedure was not run. CyberPower’s runtime estimate is based on new, fully charged batteries under normal operating conditions. Actual runtime can vary with battery age, charge and environment. CyberPower CP1000PFCLCDa specifications

Visit the Homelab UPS overview or browse the guide index.

Related

Illustrated title card for the guide: Pure Sine Wave vs Simulated Sine Wave UPS for Active PFC

Pure Sine Wave vs Simulated Sine Wave UPS for Active PFC

Choose a UPS waveform for an active-PFC power supply, check the output on battery, and configure USB shutdown on a QNAP NAS running QTS.

Illustrated title card for the guide: Synology NAS as a NUT Server for Proxmox and TrueNAS NUT shutdown guides

Synology NAS as a NUT Server for Proxmox and TrueNAS

Turn on the network UPS server in Synology DSM, then set up Proxmox VE upsmon and the TrueNAS UPS service as NUT clients of the NAS.

Illustrated title card for the guide: NUT vs apcupsd for Linux and Proxmox Homelabs

NUT vs apcupsd for Linux and Proxmox Homelabs

Compare NUT and apcupsd for Linux and Proxmox. Match your UPS to a driver, choose where to run the monitor, and plan the order for guest shutdown.